Works Notification Cremorne Rail Bridge, Alexandra Avenue, South Yarra24-29 August 2025
- csyapts
- Aug 20, 2025
- 1 min read
When
The works are currently scheduled between 10pm and 5am, Sunday 24 August to 5am Friday 29 August.
Road closure
• Alexandra Avenue will be closed with traffic from east detouring via Chapel Street and traffic from the West detouring via Punt Road.
• Pedestrians and Bike riders will be detoured via the Capital City Trail.
• Local pedestrian and vehicle access will be maintained at all times along Alexandra Avenue with traffic controllers in place to safely guide pedestrians and vehicles around the work area. Please politely make them
aware you are local.


